Skip to content

Projects in Progress

Plumbing Contract

Quarra Stone Headquarters | Plumbing Contract & Site Utility

WI Dells School District High School New Auditorium

Jefferson County Courthouse and Sheriff’s Building | Addition and Renovation

UW Madison Gymnasium and Natatorium Replacement | Plumbing Contract & Site Utility

Madison Metropolitan School District East High School

Madison Metropolitan School District Memorial High School

Building 1 Code Compliance & Renovation Central WI Center

Metro Transit Phase 3A Maintenance and Driver Facility Improvements

City of Pewaukee Department of Public Works Garage

Mauston High School Addition and Renovation

UW Chemistry Building | Addition and Renovation
Sellery Hall | Addition and Renovation
Gymnasium and Natatorium Replacement

MSN Dane County Regional Airport South Terminal Expansion

Fire Protection

Seven Acres Restaurant

Jenny Wren Trail

Quarra Stone Headquarters | Plumbing Contract & Fire Protection

Site Utility

HSA Interstate Business Park

UW Madison Gymnasium and Natatorium Replacement | Plumbing Contract & Site Utility

Waunakee Public Works Reconstruction

Stoughton Academy Street Reconstruction

John Wall Flex Building

Middleton Flex Buildings

Plumbing Project Gallery

Camp Randall Student Athletic Performance Center

DeForest New Intermediate School and Facilities Building

Scope: Plumbing Contract & Fire Protection
Category: Retrofit
Description: New 205,000-square foot building. Building features a multi-purpose cafeteria with a full kitchen, library media center, gymnasium, secure main entrance and classrooms for 4th, 5th and 6th grade students.

 

Camp Randall Student Athletic Performance Center

Iowa County Law Enforcement Center

Scope: Plumbing Contract & Fire Protection
Description: New 74,000-square Foot Building. New facility will house the Iowa County Sherriff’s Office, Jail, Emergency Management and Coroner’s Office and allows for future expansion of county facilities on the site.

Camp Randall Student Athletic Performance Center

UW-Madison Witte Hall

Scope: Plumbing
Category: Retrofit
Description: Renovated 231,000 gsf building composed of two wings with ten floors and addition of an eleventh floor and new connector. The project was constructed while the building was continuously occupied.

Camp Randall Student Athletic Performance Center

UW Madison Meat Science & Muscle Biology

Scope: Plumbing, Fire Protection
Category: New Construction
Description: A new two-story modern teaching, research, and outreach facility to support the meat industry of the State of Wisconsin. The new laboratory will facilitate the development of modern meat processing and research through the inclusion of lab general-purpose benches for biochemical, chemical, and microbial studies as well as more specialized rooms for microscopy, tissue culture, instrumentation, and cold experiments. This project replaces the existing Meat and Muscle Biology Building built in three sections in 1930, 1959, and 1969.

Camp Randall Student Athletic Performance Center

Verona Area High School

Scope: Plumbing
Category: New Construction
Description: Construction of a new 585,000 gsf 3-story building complete with competition athletic facilities on a 150-acre site.

Camp Randall Student Athletic Performance Center

Camp Randall Student Athletic Performance Center

Scope: Plumbing, Fire Protection, Site Utilities
Category: Retrofit
Description: Monona Plumbing and Fire Protection was recognized in the “Specialty Contractor- Plumbing” category for our work on the Camp Randall Student Athletic Performance Center with the AGC 2013 Build Wisconsin Award. This first phase of the renovation project to Camp Randall led to the completion of the private tunnel that connects the stadium field to the locker rooms, training facilities and offices. As an integral partner on this project Monona Plumbing and Fire Protection was responsible for the site utilities within the tunnel as well as the plumbing and fire protection on the north end zone remodel. The project was on a tight time table to get things ready for the fall football season and home games. – Camp Randall is the oldest stadium in the Big Ten Conference, and was ready for some much needed upgrades to their current facilities. Camp Randall was originally opened as a fully functioning stadium in 1917 and has since undergone several expansions and renovation projects since that time and today seats over 80,000 fans.

1063313-EpicFarm6

Epic Farm Campus

Scope: Plumbing
Category: New Construction
Description: Winner of the 2013 Daily Reporter Top Projects Award for Best in Show, Epic Farm Campus is a 3 office building project comprised of 960 total offices, an underground parking garage, and a cafe – all themed after traditional Wisconsin farms.

Epic King’s Cross

Epic King’s Cross

Scope: Plumbing
Category: New Construction
Description:  Inspired by London’s King’s Cross Railway Station, this Epic Campus building totals over 100,000 square feet and includes food service and kitchen setups.

1079272-Lakeshore2.w1024

Lakeshore Dorm | LEED – GREEN PROJECT

Scope: Plumbing
Category: New Construction
Description: Monona Plumbing and Fire Protection accepted the 2014 Build Wisconsin Award for our part in the construction of the Lakeshore Dorm – Leopold Hall. This LEED Gold-level certified project is an example of innovation and partnership for all involved. In addition to the plumbing work, the project also included the installation of rooftop solar panels to support the hot water heating system as well as water consumption monitors throughout the building. Monona Plumbing and Fire Protection’s suggestion to prefabricate the solar panel assembly prior to installation saved valuable time and greatly improved safety on the jobsite.

1105999-prairie_cover_small.w1024

Prairie Elementary – Waunakee

Scope: Plumbing
Category: New Construction, Additions
Description: Prairie Elementary School underwent a 12,000 sq ft addition along with interior remodeling in the existing school facility. Monona Plumbing and Fire Protection completed the Plumbing work for this project.

1079279-DaneGarage1.w1024

Dane County Garage

Scope: Plumbing
Category: New Construction
Description: The new Dane County Highway Garage facility replaced two existing facilities in the eastern part of the county and is now the central facility for Dane County’s fleet of snowplow trucks. Monona Plumbing and Fire Protection provided the plumbing work for the over 80,000 sq ft building

Fire Protection Gallery

MAIN_Deforest Intermediate_Plumbing_FP 1 1

DeForest New Intermediate School and Facilities Building

Scope:  Plumbing Contract & Fire Protection
Description: New 205,000-square foot building. Building features a multi-purpose cafeteria with a full kitchen, library media center, gymnasium, secure main entrance and classrooms for 4th, 5th and 6th grade students.

MAIN_Iowa county law enforcement center

Iowa County Law Enforcement Center

Scope: Plumbing Contract & Fire Protection
Description: New 74,000-square Foot Building. New facility will house the Iowa County Sherriff’s Office, Jail, Emergency Management and Coroner’s Office and allows for future expansion of county facilities on the site. 

Meat Muscle_1 1

UW Madison Meat Science & Muscle Biology

Scope: Fire Protection, Plumbing
Category: New Construction
Description: A new two-story modern teaching, research, and outreach facility to support the meat industry of the State of Wisconsin. The new laboratory will facilitate the development of modern meat processing and research through the inclusion of lab general-purpose benches for biochemical, chemical, and microbial studies as well as more specialized rooms for microscopy, tissue culture, instrumentation, and cold experiments. This project replaces the existing Meat and Muscle Biology Building built in three sections in 1930, 1959, and 1969.

Promega R_D_MAIN PHOTO

Promega R&D | Fitchburg, WI

Scope: Fire Protection

Category: New Construction

Description: 270,000 sq ft lab and office building.

The McKenzie Family Boys and Girls Club

The McKenzie Family Boys and Girls Club | Sun Prairie, WI

Scope: Plumbing and Fire Protection

Category: Retrofit

Description: Renovation of an existing church building. 

1079273-SaintGobain8.w1024

Saint Gobain

Scope: Plumbing, Fire Protection
Category: New Construction, Additions
Description: Monona Plumbing and Fire Protection handled both Fire Protection and Plumbing system work at the Saint-Gobain Portage plant expansion. We completed a complete sprinkler system installation for the warehouse, consisting of over 700 sprinkler heads. Installation of a complete underground sanitary system, storm & clear water system, and fixtures throughout the site were handled by our Plumbing team.

badger-prairie

Badger Prairie Needs Network

Scope: Fire Protection
Category: Retrofit
Description: After several years of searching for a new home, Badger Prairie Needs Network moved into a county-owned building that had been vacant for several years. The 7,000 square foot building required remodel work to the building in order to accommodate BPNN’s needs. Monona Plumbing and Fire Protection completed all of the Fire Protection work on this project.

festival-foods

Festival Foods

Scope: Fire Protection
Category: New Construction
Description: The Festival Foods project included unique architecture that we worked around with our fire protection installation. Locally grown trees were culled to prevent the spread of the Emerald Ash Borer then treated to be used as structural support. Festival Foods connects directly to The Galaxie apartment complex and contains both wet and dry fire protection systems.

1064383-NicholsStation5.w1024

Nichols Station

Scope: Fire Protection, Plumbing
Category: Retrofit
Description: Nichols Station is a designated Historical Landmark in Madison, WI. Built in 1917, it played an important part in the advancement of water works technology in Wisconsin\’s capital city, pumping 8 million gallons of water a day to the city. In 2015, the historical building underwent a comprehensive renovation project that transformed all 34 apartment units within the building, all while keeping the historic features of the building preserved. Monona Plumbing and Fire Protection handled the Fire Protection and Plumbing needs for this extensive renovation.

1079275-TowerRock4.w1024

Tower Rock Elementary

Scope: Site Utilities, Fire Protection, Plumbing
Category: New Construction, Education
Description: Monona Plumbing and Fire Protection performed Site Utilities, Fire Protection, and Plumbing work on this new addition to an existing school. Due to the rural location of the school, adequate water supply was not available. Two water tanks were added underground to supply a vertical turban pump to provide water to the system.

1079276-WisBrewing1.w1024

Wisconsin Brewing Company

Scope:Fire Protection, Plumbing
Category: New Construction, Specialty Piping
Description: Wisconsin Brewing Company is one of Wisconsin’s newest breweries and has the capacity to make up to 100,000 barrels per year. The taproom can hold several hundred visitors at a time and includes large windows where visitors can see into the brew room at all times. Monona Plumbing and Fire Protection handled both Fire Protection and Plumbing on this large project. This 20,000 sq ft facility opened to the public in Fall of 2013.

1079282-CampRandall3.w1024

Camp Randall Student Athletic Performance Center

Scope:Plumbing, Fire Protection, Site Utilities
Category: Retrofit
Description: Monona Plumbing and Fire Protection was recognized in the “Specialty Contractor- Plumbing” category for our work on the Camp Randall Student Athletic Performance Center with the AGC 2013 Build Wisconsin Award. This first phase of the renovation project to Camp Randall led to the completion of the private tunnel that connects the stadium field to the locker rooms, training facilities and offices. As an integral partner on this project Monona Plumbing and Fire Protection was responsible for the site utilities within the tunnel as well as the plumbing and fire protection on the north end zone remodel. The project was on a tight time table to get things ready for the fall football season and home games. – Camp Randall is the oldest stadium in the Big Ten Conference, and was ready for some much needed upgrades to their current facilities. Camp Randall was originally opened as a fully functioning stadium in 1917 and has since undergone several expansions and renovation projects since that time and today seats over 80,000 fans.

Site Utility Gallery

1079275-TowerRock4.w1024

Tower Rock Elementary

Scope: Site Utilities, Fire Protection, Plumbing
Category: New Construction, Education
Description: Monona Plumbing and Fire Protection performed Site Utilities, Fire Protection, and Plumbing work on this new addition to an existing school. Due to the rural location of the school, adequate water supply was not available. Two water tanks were added underground to supply a vertical turban pump to provide water to the system.

1079292-DonMiller1.w1024

Don Miller Fiat

Scope: Site Utilities
Category: Underground

1064393-WaunakeeGeothermal2.w1024

Waunakee Intermediate Site & Geothermal

Scope: Site Utilities
Category: Underground

1064394-NineMound3.w1024

Nine Mound Road

Scope: Site Utilities
Category: Underground

1079282-CampRandall3.w1024

Camp Randall Student Athletic Performance Center

Scope: Plumbing, Fire Protection, Site Utilities
Category: Retrofit
Description: Monona Plumbing and Fire Protection was recognized in the “Specialty Contractor- Plumbing” category for our work on the Camp Randall Student Athletic Performance Center with the AGC 2013 Build Wisconsin Award. This first phase of the renovation project to Camp Randall led to the completion of the private tunnel that connects the stadium field to the locker rooms, training facilities and offices. As an integral partner on this project Monona Plumbing and Fire Protection was responsible for the site utilities within the tunnel as well as the plumbing and fire protection on the north end zone remodel. The project was on a tight time table to get things ready for the fall football season and home games. – Camp Randall is the oldest stadium in the Big Ten Conference, and was ready for some much needed upgrades to their current facilities. Camp Randall was originally opened as a fully functioning stadium in 1917 and has since undergone several expansions and renovation projects since that time and today seats over 80,000 fans.

Mechanical Project Gallery

Fond Du Lac Radium_Cover

Fond Du Lac Radium Removal Project

Scope: Mechanical
Category: Municipalities
Description: Radium removal facilities including filter equipment, well pumps, pumping equipment, site process piping and chemical systems.

1064398-MadisonWell301

Madison Unit Well 30

Scope: Mechanical
Category: Municipalities
Description: Reservoir, booster pumps, piping, and chemical feed systems.

1079333-Fond_du_Lac__Janesville_180.w1024

Janesville Pump Station 15

Scope: Mechanical
Category: Municipalities
Description: Installation of booster pumps, piping, site piping, and chemical feed systems in the new facility

1079294-MadisonWell71

Madison Unit Well 7

Scope: Mechanical
Category: Municipalities
Description: Water treatment facility including ATEC filter equipment, reservoir, booster pumps, well pump, site process piping, and chemical feed systems

1079295-Greenville5

Greenville Well No. 3

Scope: Mechanical
Category: Municipalities
Description: New iron filtration facility and well pump modifications

1064409-Verona6

Verona Well No. 5

Scope: Mechanical
Category: Municipalities
Description: 500 gallon reservoir, booster pumps, well pump, piping and chemical feed systems

1079296-MMSD9

MMSD Pumping Station 18

Scope: Mechanical
Category: Municipalities
Description: New wastewater pumping station including centrifugal pumps, screening equipment, valves, gates, and process piping

1079315-Cover_EVANSVILLE.w1024

Evansville WWTF

Scope: Mechanical
Category: Municipalities
Description: Wastewater treatment improvements project with new headworks facility, service building, vertical loop reactor, lift station, blower equipment, pumps and process piping

1078772-Evansville_june_9,_2010_056.w1024

Algoma Well No.3 Facility

Scope: Mechanical
Category: Municipalities
Description: New well facility, administration and garage building including filter equipment, well pumping equipment, and chemical feed systems

1078773-Filter_install_001.w1024

Elkhorn Lakeland Water Treatment

Scope: Mechanical
Category: Municipalities
Description: Water treatment facility including filter equipment, aerator, booster pumps, brine system and chemical feed systems

1078774-Elkhorn__Fort_Atkinson_024.w1024

Fort Atkinson Booster Station

Scope: Mechanical
Category: Municipalities
Description: The project included booster pump equipment, piping, and chemical feed systems

1079325-DSC00536.w1024

Stevens Point Well 11

Scope: Mechanical
Category: Municipalities
Description: Water treatment facility including well pumping equipment, vertical turbine booster pumps, gravity filters, aerator, process piping and chemical feed systems

1079328-P1010327

Janesville Pump Station 12

Scope: Mechanical
Category: Municipalities
Description: Water treatment facility including a 400 gallon reservoir, booster pumps, and chemical feed systems

Monona Plumbing & Fire Protection Inc.
3126 Watford Way
Madison, WI 53713

Phone | 608.273.4556
Fax | 608.273.8492
Email | service@mononapfp.com

Monroe Office
633 1st Ave
Monroe, WI 53566

Phone | 608.336.3060
Email | service@mononapfp.com

FED CONTRACTOR ID #082812991

Regular Business Hours
Monday – Friday 7am – 4pm
*Our office employees are able to flex their Friday afternoon hours and may not be in the office after noon on Fridays. 

Direct Service Line During Regular Hours
Plumbing & Sprinkler Service: 608.216.9034

24/7 Service
Evenings, Weekends and Holidays
608.273.4556

 

Make a Payment

Review Us Request Information 

 

© 2023 Monona Plumbing & Fire Protection Inc. All Rights Reserved.